This project was formally known as the Tubemakers Australia DuraGal Manufacturing plant and is located in Somerton, Victoria.
The plant has been constructed on a 105 ha site and consists of approximately 35,000 m² of buildings and approximately 30,000 m² of external roads and hardstand pavement including very heavy duty forklift pavement for the storage and handling of steel coil.
DNM scope included design, documentation and observation of construction for civil, structural, services coordination and general arrangement drawings as well as the design and documentation of a wetland and habitat protection/restoration system to cater for a total catchment area of 132 ha inclusive of adjoining residential land.